Chargement...
Construction products · CPR / ESPR
Indicative Commission timelineConstruction-product manufacturers must link DoP, essential performance and resolvable identifiers. The Commission indicates adoption in Q2 2027 via the CPR path (indicative) — not yet a fixed compliance obligation like the battery passport.

Is the construction DPP mandatory from Q2 2027?
No. Q2 2027 is the indicative adoption window (CPR path), not the compliance date. After adoption: applicable transition. Only the battery passport has a fixed placing-on-the-market date (18 February 2027).
DoP, CPR performance and mill → site continuity: the DPP must speak to BIM and controls.
The declaration of performance (DoP) is already central: a construction DPP must articulate with it, not duplicate it as a marketing PDF.
Strength, fire, insulation, emissions: technical data to make resolvable and machine-readable.
Distributors, contractors, clients: every node must resolve the same identifier without re-keying.

Source: European Commission — Digital Product Passport page Commission UE
CPR path for construction products; articulation with the DPP framework.
General DPP framework for most physical goods placed on the EU market. Product requirements are set via delegated acts.
The CPR path will set product scope, the DoP link and DPP requirements. Not enforceable until texts are adopted / applicable.
The European registry indexes passports (identifiers). Business data stays with the operator or their provider. Live since July 2026, per the Commission.
Manufacturers and placers of construction products on the market — detail in CPR / DPP texts.
DoP and CE marking operators: performance consistency, documentation and identifiers.
DoP link, essential performance, composition / substances, end of life — to be confirmed officially.
Resolvable identifier on label, product sheet or site documentation — format per final rules.
Four CPR / DPP workstreams.
Map product refs, DoP and certificates into one resolvable model.
Make technical data (fire, mechanical, emissions) exportable in a machine-readable format.
Publish a pilot DPP (e.g. an insulation or cement); test site / BIM resolution.
Define who enriches the passport (lots, deliveries) without breaking the manufacturer ID.
Living construction DPP: DoP, performance, site.
Structure built to link declaration of performance and digital passport.
GS1 Digital Link, JSON-LD / RDF — for BIM, distributors and controls.
Lots and site deliveries enrich the passport without breaking the product ID.
We frame CPR, DoP and identifiers with exact language: indicative Q2 2027 vs confirmed obligation.